Apercu Consultants, Inc. is an environmental consulting firm, established in 2003. We provide a wide range of international quality environmental services to the following industry sectors in the country:
- Power & Energy
- Petrochemical & Petroleum
- Mining
Although relatively young as a company, Apercu is composed of highly experienced professional scientists and engineers with both specialist and broad skills honed from experiences spanning almost two (2) decades in these other industries:
- Manufacturing
- Telecommunications
- Real Estate
- Ports
- Aviation
- Industrial Parks
- Agri-Chemical
- Roads and Highways
- Cement
As a boutique consultancy firm, we provide the flexibility and the responsiveness that clients require without compromising quality and efficiency of service. Each project is approached uniquely, assessing the needs based on our years of experience and then selecting best-fit experts for the study teams. We relate well with clients and bring not only analytical, technical and project management expertise but we provide discerning perception that gels into a holistic approach to our services.
Apercu provides services from an office in Quezon City and we are equipped with a complete array of monitoring instruments for ambient air quality, water quality and biota surveys. Apercu is committed to providing quality environmental services on time, safely and cost-efficiently.
Services
ENVIRONMENTAL STUDIES
- Environmental Impact Assessment (EIA)
- Initial Environmental Examination (IEE)
- Environmental Performance Report and Management Plan (EPRMP)
- Environmental Risk Assessment
- Due Diligence
- Baselines Studies
- Project Management
MONITORING SURVEYS
- Air Quality Monitoring
- Water Quality Monitoring
- Aquatic Biota Monitoring
- Terrestrial Fauna Monitoring
- Social Impact Assessment
- Underwater Video Monitoring
PERMITTING SERVICES
- National Commission on Indigenous Peoples (NCIP)
- Certificate of Non-Coverage (CNC)
- National Water Resources Board (NWRB)
- Environmental Compliance Certificate (ECC)
OTHER SERVICES
- Validation Studies
- Air Dispersion Modeling
- Thermal Plume Modeling
- Production of IEC Material (Coffee Table Books, Calendars, etc.)
Projects
EIA/IEE/EPRMP
- TSI 345MW Coal-Fired Power Plant Expansion, Davao City and Davao Del Sur issued an ECC (2014)
- TVI 300MW Coal-Fired Power Plant, Toledo issued an ECC (2013)
- San Gabriel Avion 115MW Power Plant, Batangas issued an ECC (2013)
- TSI 300MW Coal-Fired Power Plant, Davao City and Davao del Sur issued an ECC (2013)
- 435MW Pagbilao Power Station Complex Expansion, Quezon issued an ECC amendment (2013)
- SMC Coal-Fired Power Plant, Malita, Davao del Sur issued an ECC ( 2013)
- Petron Upgrading Projects, Bataan, issued an ECC Amendment ( 2012)
- TSI 300MW Coal-Fired Power Plant, Davao City and Davao Del Sur issued an ECC (2011)
- SMC Davao 600MW Power Plant, Malita, Davao del Sur (2013)
- EIA for the Therma Visayas Inc. 330 MW CFB Power Plant, Toledo City, Cebu (2013)
- EPRMP for the Pagbilao Power Station Complex Expansion (2013)
- EPRMP for the Petron Bataan Refinery Upgrading Projects (2012)
- IEE Report for the 15MW Sagada-Besao Wind Farm Project, Mountain Province (2012)
- EIA for the Therma South, Inc. 300 MW CFB Power Plant, Davao City & Sta. Cruz, Davao del Sur (2011)
- EIA for Grand Planters International Inc.’s Coal Handling Facility (2010)
- IEE for the Petron Bataan Refinery Propylene Pipeline Project (2010)
- EPRMP for Petron Bataan Refinery’s Upgrade Projects (2010)
- EPRMP for Balai sa Laiya and Tivona Beach Resorts (2010)
- EIA for the Zambales Nickel and Chromite Mining Project of Rusina (2008)
- Philippine Power Market Study for Worley Parsons, Singapore Office (2008)
- IEE for 12 MW Rice hull/Coal power plant for Bataan 2020 (2007)
- IEE for the Bolitoc Port Rehabilitation Project (2007)
- Integrated Environmental Risk Assessment for the Sta. Rita and San Lorenzo Natural Gas Power Plants (2007)
- EIA for 100 km CALABARZON Natural Gas Transmission Pipeline Project for First Gas Holdings Inc. (2004)
- EPRMP for Petron Bataan Refinery’s Benzene, Toluene and Xylene Project (2007)
- EPRMP for Petron Bataan Refinery’s Petro-Fluidized Catalytic Cracking Unit Project (2006)
- Development of a Predictive Emissions Monitoring System for the Bauang Power Plant (2006)
- Bathymetric Mapping of Macajalar Bay in the vicinity of the Mindanao. Coal-Fired Power Plant of Steag State Power Inc. (2006)
- Beach Sediment Characterization Study for the Mindanao Coal-Fired Power Plant of Steag State Power Inc. (2005)
- Accion Contra El Hambre (Spanish Government Organization) Marine and Land Resource Capacity Study (2004)
Due Diligence/Audits
- Environmental Risk Audit, Sta. Rita 1063MW and San Lorenzo 550MW CCGT Power Plants, Batangas (2013)
- Environmental Compliance Audit, 1200MW Keilco Combined-Cycle Power Plant Ilijan, Corporation, Batangas (2011, 2012)
- Environmental Compliance Audit, Pagbilao Power Station, Quezon (2011)
- Environmental Due Diligence of the Navotas Power Barges for Aboitiz Power Corporation (2011)
- Environmental Due Diligence of the Calaca Coal-fired Power Plant for Worley Parsons (2007)
- Environmental Due Diligence of the Mirant Power Assets (Pagbilao and Sual) in the country for PB Power (NZ) Ltd. (2006)
- Environmental Due Diligence of the Ilijan Power Plant in Batangas for PBPower (NZ) Ltd. (2006)
- Environmental Due Diligence of the Masinloc Coal-Fired Power
Plant under Snowy Mountain Engineering Consultants (2007)
- Environmental Due Diligence of the Masinloc Coal-Fired Power Plant for the Chenhua Group Beijing (2007)
- Annual Environmental Audit for the Mindanao Coal-Fired Power Plant (2004 to 2010)
Monitoring
- Quarterly Ambient Air and Noise Level Monitoring in Caibiran, Biliran
- Ambient Air Quality & Noise Monitoring and Stack Emission Monitoring for the PGPRC Gold Project (30MW power plant) in Aroroy, Masbate
- Aquatic Biota Monitoring of the 1063MW Sta. Rita and the 550MW San Lorenzo CCGT Power Plants (2003- Present)
- Semi-annual Marine Monitoring, 1200MW Keilco Combined-Cycle Power Plant, Ilijan, Batangas (2011-2013)
- Quarterly Ambient Air Quality Monitoring, GNPower Mariveles Coal-fired Power Plant, Bataan (2012-2013)
- Quarterly Ambient Air Quality Monitoring, Berong, Palawan (2012-2013)
- Fishery Practices Survey, Bulalacao Island, Coron, Palawan for SPEX (2012)
Semi-annual Marine Monitoring Surveys, Redondo Peninsula Energy, Zambales (2012)
- Annual Health Study for the Steag 210MW Power Plant, Mindanao (2011,2012)
- Ambient Air and Emissions Quality Monitoring for the Filminera Power Plant in Masbate (2011-2012)
- Environmental Risk Assessment of the Marine Resources in the Vicinity of the Kepco Ilijan Natural Gas Power Plant in Batangas (2010)
- Mangrove/Seagrass and Marine Reserve Program for the Mindanao Coal-Fired Power Plant (2003–2010)
- Quarterly Marine Resources Monitoring for the Mindanao Coal-Fired Power Plant (2003-2010)
- Marine resources Monitoring for the 215 MW Bauang Power Plant (2003 and 2004)
- Ambient Air Quality Monitoring for the 215 MW Bauang Power Plant
- Mangrove Inventory of the Sta. Rita and San Lorenzo Power Plants (2003)
- Weekly Air Quality Monitoring of the Mindanao Coal-Fired Power Plant (operations phase) (2008–2010)
- Monthly Ambient Air Quality Monitoring during the construction of the Mindanao Coal-Fired Power Plant (2005-2008)
- Monthly Monitoring of Water Quality (Marine and Freshwater) in the vicinity of the Mindanao Coal-Fired Power Plant (construction through to operations phases 2003-2010)
- Quarterly Emissions Monitoring of the Mindanao Coal-Fired Power Plant (Operations phase 2008 -2010)
Environmental Risk Assessment
- SMC Davao 600MW Power Project
- Therma Visayas Inc.’s 330MW Coal-fired Power Plant Project
- Pagbilao Power Station Complex Expansion Project
- Petron Bataan Refinery Upgrading Projects
- PBR Benzene, Toluene, and Xylene ( BTX) EPRMP Project
- PBR Petro-Fluidized Catalytic Cracking Unit ( Petro-FCC) EPRMP
- Integrated Risk Assessment for the Sta. Rita and San Loranzo CCGT Power Plants
Other Projects
- Project Management of Geotechnical and Site Investigation Studies for a power plant site, Toledo City, Cebu
- Bathymetric Survey for he Pagbilao Power Station Complex Expansion (2013)
- Thermal Plume and Air Quality Modeling Studies for a power plant in Zambales
- Bathymetric and temperature profile studies in Manila Bay, Limay, Bataan Daelim Industrial Co., Ltd.
- Cumulative Impact Assessment Study for the Sta. Rita and San Lorenzo Natural Gas Power Plants, Batangas
- Giant Clam Seeding for Kepco Ilijan Corporation, Batangas
- Marine Assessment of Intake Velocity Cap, Beach and Jetty Area for Kepco Ilijan Corp. (2010)
- Air Quality Modeling and Thermal Plume Modeling for Treasure Steel Corp. (2010)
Contact Us
Apercu Consultants Inc.
Address: Rms. 306-307, Philippine Social Science Center Commonwealth Avenue cor. Central Avenue Diliman, Quezon City 1101
Phone: (632) 929 2778
Telefax: (632) 455 2778
E-mail: inquiry@apercu.biz.ph
Find us on Google Maps
sponsored links
back to top
SIMILAR COMPANIES/PRODUCTS/SERVICES
back to home page
Terms of Use/Privacy Policy Advertise Buy me coffee
Apercu Consultants Inc.