3. Cost

The cost “per square meter” estimate, which currently ranges from PhP 27,000 to PhP 35,000, is a rough and aggressive ballpark figure based on prevailing cost of construction in the country. We use it in initial client presentations only for reference purposes, but we do not actually charge based on it. The determination of the actual project cost entails a more accurate and detailed cost analysis based on some factors like: total floor area, material and finish specifications (which can be from the most basic to the outright luxurious), lot location and topography, and time frame – a house can be done faster with more manpower, but this adds to the cost.

The better alternative is the other way around. Give us your budget and our architect will design a custom house with the appropriate size and maximum specifications that can be bought with what you can afford.

Confidently, we assure you that when we build your home, the projected cost of the construction is fairly accurate because our cost estimate is based on correct “value engineering” principles. We are able to work on your budget by coming up with the best alternative materials and methods without sacrificing quality. So, just tell us how much you are willing to invest and we can start from there.

Terms of Payment

With budget in mind, the house plans are designed and drawn, technical specifications and bill of materials are prepared and the final project cost is reached. When all parties are agreeable, an Agreement of Construction contract is executed and building permits are secured; the construction phase will begin consequently.

We at Builders Philippines do everything we can to make this whole process stress-free by offering clients upfront computations and being open about processes and potential budgetary risks. Some outright costs are house design fees and processing fees for building permits.

Payment terms basically goes this way: upon signing of the construction contract, we ask for ten percent (10%) initial payment to close the deal. When the Building Permits are released, the twenty percent (20%) down payment is settled to finally start with the actual house construction. The balance will be paid through a monthly progress billing scheme.

How can we assure you that your custom home is built to schedule and within budget?

Philippine Builders commits itself to completing projects on time and to never go over budget. We do this by preparing all purchase orders based on the bill of materials immediately after the signing of the construction contract, before the actual construction even begins. This puts us away from possible price escalation of materials during the construction phase, which is usually the reason why other contractors go beyond the contracted project cost.

sponsored links

back to top

previous page     next page

SIMILAR COMPANIES/PRODUCTS/SERVICES

back to home page

Terms of Use/Privacy Policy   Advertise   Buy me coffee

 

filbuild
Borines Builders Corporation

1. About Us / Services

2. Construction Process

3. Construction Cost

4. PAG-IBIG Fund

5. Contact Us